When two phytoremediation plots at Vance Air Force Base were no longer part of the current remedial action plan, the site needed to be restored for its next use.
Whiterock was selected to decommission the plots and manage the restoration work. Our team removed and disposed of 268 trees and stumps along with approximately 500 feet of concrete curbing, then backfilled and compacted the disturbed areas and finished them with topsoil.
The site was replanted with Bermuda grass and maintained until the required vegetation standards were met. Whiterock provided the project management, equipment operation and field execution needed to complete the physical restoration work—excluding final vegetation establishment—in just one week.
Location: Vance Air Force Base, Enid, Oklahoma
Services: Land Reclamation, Site Restoration